eRIA Video Tutorials

 

To access the Table of Contents with links to different sections:
1. Click to play the video
2. Click on Show More under the video in the YouTube screen to display content links

PI Must Review AND Sign Protocols Prior to IRB Submission
No Table of Contents Total video length: 4:58

Complete and Submit a New IRB Protocol Application in eRIA
Table of Contents (In YouTube view): Total video length: 12:58

  • Create a Protocol
  • Copy of Existing Protocol
  • Navigate and Fill out the IRB Application
  • Add Research Personnel
  • Save, Find, and Finish the Application Later
  • Add Attachments to the Application
  • Electronic Signatures
  • Lock, Submit, Done, and Logout

Submit a Modification, Continuing Review, Reportable New Information, or Closure Form
Table of Contents (In YouTube view): Total video length: 11:56

  • Logging In
  • Submit a Modification Form
  • IMPORTANT: Form Signatures
  • Submit a Continuing Review Form
  • Submit a Reportable New Information Form
  • Submit a Study Closure Form

Work with IRB Applications Approved Prior to eRIA (before 7-25-2017)
Table of Contents (In YouTube view): Total video length: 14:45

  • Submit a Modification for a Pre-eRIA Approved IRB Application
  • Electronic Signatures
  • Submit a Continuing Review for a Pre-eRIA Approved IRB Application
  • Submit a Reportable New Information for a Pre-eRIA Approved IRB Application
  • Submit a Closure for a Pre-eRIA Approved IRB Application

Using eRIA for IRB Committee Members and Reviewers
Table of Contents (In YouTube view): Total video length: 13:00

  • Logging In
  • Review a Submission
  • Add Review Comments
  • Read or Reply to Existing Comments
  • Select Review Status & Recommendation
  • Compare Two Versions of an E-Form
  • Locate an IRB Committee Meeting Agenda
  • Locate IRB Committee Meeting Minutes